Wednesday 20th September 2017

Arbutus - Scheduled Maintenance Sept 26 9:00-10:00 am ET/6:00-7:00 am PT, scheduled 4 months ago

A BC Net router line card that the Arbutus router is connected to, is scheduled to be replaced due to a hardware issue on Sept 26 at 9:00am ET. There is a backup 2x10Gb link that should auto fail-over during this time so no network outage is expected during this maintenance period.